All bids 14 documents filed with this bid. All filings are public under NH RSA 91-A.
AwardedPublic Worksconstruction
IFB-25-088
Cocheco Bridge Structural Repair
Structural rehabilitation of the Cocheco Street bridge including deck replacement and bearing assembly.
- Published
- Jun 2, 2025
- Was due
- Jul 10, 2025
- Estimated
- $2,100,000
- Awarded
- $2,045,000
Cocheco St Bridge, Dover, NH
Awarded to
NH Pipe Works Inc.
Local · 11 lifetime wins · $8,123,000 total
Bid tabulation
- Winner$2,045,000
- $2,097,000
- $2,188,000
The winning bid was $97,500 lower than the average of the other bids.